Tunnel Sadd Ariana

Loading...

Projects

Projects

Providing material for the body of Rogun Dam from rock mine number 26 located downstream of the left flank of the dam using drill and blast

Start date:

30-June-2024

Due date:

04-April-2022

Status:

Completed

Technical area:

Mining - Mine infrastructure

Employer:

Ministry of Energy and Water Resources of the Republic of Tajikistan – OJSC Rogun HPP

Background:

Rogun Dam is a partially finished large clay-core rock-fill dam, expected to be the world’s highest and tallest dam when completed. It is located on the Vakhsh River in southern Tajikistan, upstream from the Nurek Dam. 
It is designed to rise to a height of 1,099 feet (335 meters) above the canyon floor and to have a crest length of 2,165 feet (660 meters). Its design also includes the building of six hydroelectric generating units with a power capacity of total 3,600 megawatts. Construction is expected to be completed in 2028.

Roles:

Drilling,blasting, demolishing, loading, and transporting of excavated materials to the depot site